離心泵自動(dòng)供水裝置的安裝工藝
Ordinary centrifugal pump automatic water supply the installation process
在地面的井管上,首先安裝底閥連接井管三通,在井管上方依次安裝閥門和和手壓井頭;其次連接機(jī)泵和逆止閥;第三再連接供水管9和供水閥門,在壓力罐上安裝電節(jié)點(diǎn)壓力表,并在地面安裝配電設(shè)施即可。
Tube wells in the ground, first install the valve connecting the end of tube wells three, in the well pipe at the top of the order to install valves and killing head and hands; second to connect pump and check valve; third to be connected to water supply pipe 9 and water supply valves, pressure tank pressure gauge on the installation of electric nodes, and distribution facilities can be installed on the ground. |